There is a time delay? Time constant circuit? which should, at some point, engage relay #2 and put 12VDC onto the upper and lower elements.
The maximum voltage seen at the input of the top/bottom
elements is .25 volts.
The center element works fime as relay #1 is not wired through the solid state timing/time delay circuit.
Does anyone know how the upper and lower element
sequencing occurs?
Notes:
1. The defogger relay p/n 911-615-115-00 is new.
2. There is a 1.5 Ohm resistance from the input wire
to the upper and lower elements which are connected in
parallel.
3. There is a 1.9 Ohm resistance from the input wire to the
center element.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment